The difference replenishment can make.

The above shows worn coatings in the walkway at Clark Cables in Congleton. The coating had been applied onto smooth concrete and a more durable type of coating was needed for the heavy amount of traffic.

The concrete was well abraded under vacuum-control and two coats of High-build Epoxy Resin. The finished job shown below shows the transformative effects that can be achieved with fresh floor coatings in Epoxy Resin.

About the Author

You may also like these

Optimized with PageSpeed Ninja