All too often, we encounter floors where a quality floor coating has been well applied but failed simply because the concrete was no prepared before preparation. The above, taken at JD Seasonings in Wigan, shows an instance where a resin coating was applied onto power-floated concrete which was not abraded.

We removed the coating and mechanically abraded the substrate before applying two new coats of epoxy resin (viewed in the above image). The result is now a coated floor which will give years of high-performance without de-bonding or breaking up.